Here is our shooting schedule for this Saturday. Make amendments if you notice anything wrong or that could be better with it:
Shooting Schedule
Day
Setup 1 – Vocalist in cramped room individual from MOVE till breakdown.
• Improv of vocalist without microphone.
Setup 2 – Guitarist in Lift from MOVE till end.
• Improv of guitarist with stack.
Setup 3 – Band in Corner: Play Song Until just after 1,2,3,4 MOVE!
Wides:
• Other side of wall with vocalist in band.
• Wide Master Shot from Front.
• Wide From Side, camera on floor capturing feet.
CUs:
• Vocals Close Up.
• Matt Close Up.
• Nick Close Up.
• Dave Close up.
• Drums side angle from low tom.
• Constant arc back and forth around drum kit.
Improvs:
• Camera improvisation run throughs. X2
Night
Setup 4– Band against windows: Play song from MOVE till end.
Wides:
• Constant wide arc of band on dolly.
CUs:
• Vocals Close Up.
• Matt Close Up.
• Nick Close Up.
• Dave Close Up.
• HA of drum kit.
• CU of kick pedal.
• Constant arc back and forth around drum kit.
Improvs:
• Camera improvisation run throughs. X2
Setup 5– Guitarist in room next to main play from MOVE till end.
• Improv of strobing guitarist
Setup 6- Vocalist in hallway
• Tracks of feet
• Crab into wall as vocalist enters band room.
Start Something
Showing posts with label Shooting Schedule. Show all posts
Showing posts with label Shooting Schedule. Show all posts
Monday, October 12, 2009
Subscribe to:
Posts (Atom)