Music Video - Start Something - Tear Down The Flagship

Our Final MySpace Website - Click to Visit

Our Final Album Cover

Start Something

Monday, October 12, 2009

Shooting Schedule

Here is our shooting schedule for this Saturday. Make amendments if you notice anything wrong or that could be better with it:

Shooting Schedule

Day

Setup 1 – Vocalist in cramped room individual from MOVE till breakdown.

• Improv of vocalist without microphone.

Setup 2 – Guitarist in Lift from MOVE till end.

• Improv of guitarist with stack.


Setup 3 – Band in Corner: Play Song Until just after 1,2,3,4 MOVE!

Wides:

• Other side of wall with vocalist in band.
• Wide Master Shot from Front.
• Wide From Side, camera on floor capturing feet.

CUs:

• Vocals Close Up.
• Matt Close Up.
• Nick Close Up.
• Dave Close up.
• Drums side angle from low tom.
• Constant arc back and forth around drum kit.

Improvs:

• Camera improvisation run throughs. X2



Night

Setup 4– Band against windows: Play song from MOVE till end.

Wides:

• Constant wide arc of band on dolly.


CUs:

• Vocals Close Up.
• Matt Close Up.
• Nick Close Up.
• Dave Close Up.
• HA of drum kit.
• CU of kick pedal.
• Constant arc back and forth around drum kit.

Improvs:

• Camera improvisation run throughs. X2

Setup 5– Guitarist in room next to main play from MOVE till end.

• Improv of strobing guitarist

Setup 6- Vocalist in hallway

• Tracks of feet
• Crab into wall as vocalist enters band room.

No comments:

Post a Comment